
Timber frame, larch cladding, wood fibre insulation
House among the vines
A 142 m² family house on a sloping plot, set into the ground to the north and wide open to the south.
Saint-Cyr-au-Mont-d'Or · 2025 · 11 months on site
Timber-frame houses, low-energy buildings and renovations, with their materials, place and year.

Timber frame, larch cladding, wood fibre insulation
A 142 m² family house on a sloping plot, set into the ground to the north and wide open to the south.
Saint-Cyr-au-Mont-d'Or · 2025 · 11 months on site

Rubble stone, lime render, oak joinery
A farmhouse brought back to life: lime render, oak joinery and a barn turned into a living room.
Lozanne · 2024 · 9 months on site

Steel frame, full-height glazing, reclaimed brick
A 38 m² kitchen and dining room opening onto the garden, under a building permit.
Caluire-et-Cuire · 2025 · 6 months on site

Oak parquet, lime plaster, made-to-measure joinery
A 95 m² flat redrawn around its original fireplaces: one corridor fewer, one bedroom more.
Lyon 6e · 2024 · 4 months on site

Steel, glass, terrazzo floor
A new shop front and a 70 m² boutique, accessible to wheelchair users, fitted out between two seasons.
Lyon 2e · 2023 · 10 weeks on site

Untreated larch, solar panels, timber floor
A 24 m² studio at the end of the garden, built dry in untreated larch, under a planning declaration.
Charbonnières-les-Bains · 2023 · 4 months on site
New build or renovation, the address, the surface and what matters to you. We reply within two working days.
04 78 00 11 22