Timber frame, low energy, renovation

Walls you can describe layer by layer.

We design timber-frame and low-energy houses, and renovate existing ones, with insulation, airtightness and summer comfort decided on the drawings, not on site.

Wall section

Example, outside to inside

Larch cladding22 mm
Ventilated air gap27 mm
Wood fibre board60 mm
Timber studs and insulation200 mm
Vapour control membranefilm
Service void and lining45 mm

Each project gets its own build-up, calculated for its climate, its orientation and its budget.

Built, and lived in

All the buildings

Timber frame, larch cladding, wood fibre insulation

House among the vines

A 142 m² family house on a sloping plot, set into the ground to the north and wide open to the south.

Saint-Cyr-au-Mont-d'Or · 2025 · 11 months on site

Rubble stone, lime render, oak joinery

Restored stone farmhouse

A farmhouse brought back to life: lime render, oak joinery and a barn turned into a living room.

Lozanne · 2024 · 9 months on site

Steel frame, full-height glazing, reclaimed brick

Glass extension on a 1930s house

A 38 m² kitchen and dining room opening onto the garden, under a building permit.

Caluire-et-Cuire · 2025 · 6 months on site

Oak parquet, lime plaster, made-to-measure joinery

Flat in an old building

A 95 m² flat redrawn around its original fireplaces: one corridor fewer, one bedroom more.

Lyon 6e · 2024 · 4 months on site

What low energy means on our drawings

Orientation first
Large openings to the south, protected from the summer sun, few to the north. It costs nothing, and nothing makes up for it later.
Insulation and airtightness
Continuous insulation, junctions drawn one by one, and an airtightness test before the linings close the walls.
Summer comfort
Dense insulation, shading and night ventilation, so the house stays cool without relying on air conditioning.
The regulation
Since 1 January 2022, the permit of a new house includes a certificate that the RE2020 environmental regulation has been taken into account. We prepare it with the thermal engineer.

After their first winter, and their first summer

The wall build-up was explained on a single sheet, layer by layer. We understood what we were paying for.
Claire and Mathieu D.Timber-frame house, Saint-Cyr-au-Mont-d'Or
The airtightness test was done before the linings, as planned. Two leaks found and sealed the same day.
Julien V.New house, Brindas
Our 1970s house was insulated from the outside without losing a single room.
Martine and Yves C.Energy renovation, Francheville